20 FOOT BIT CRIB

Our 20ft BIT CRIB containers are created with ease of transport in mind and we strive to meet the fastest turnaround times in the industry. Our containers come with an extensive list of standard features and can be customized specifically to our clients’ requirements. BIT-RAM has over 40 years of modular construction and HVAC experience  and our designed and fabricated Crypto Currency Mining Containers and Electrical Data Centres are completed with quality and flexibility for profitable and productive mining operations.

20 FOOT BIT CRIB Standard Specifications:
  • Full Electrical Service Fit Out (~500000 watts)
  • c/w twelve (12), 200 amp Power Distribution Units (PDUs)
  • Electrical Distribution – Raceway / Racking system with concealed wiring
  • Network Cabling and required switches
  • Interior of building c/w white finished cladding
  • Insulated walls and roof
  • Hot Deck Containment
  • Fully Balanced Exhaust Air System
  • Fully Balanced Recirculation Air System
  • Integrated Recirculation Bypass
  • Intake Filter Rack c/w 24”x24”x2” MERV 8 Filters
  • Air Flow, Temperature, and Humidity Sensors
  • Weather Hoods *SHIPPED LOOSE*
  • Checkerboard Flooring throughout
  • Required Lighting
  • Man Doors
  • Exterior of building c/w cladding and paint

KEY FEATURES

FULLY CUSTOMIZABLE – Flexible Design Options
FABRICATE TO ASIC AND GPU MINING APPLICATIONS
REMOTE ACCESS CAPABILITIES
ENGINEERED VENTILATION SYSTEM
NETWORK INFRASTRUCTURE – CAD 6 CABLE / NETWORK COMPONENTS
FULL CAD CAPABILITY
HIGH QUALITY CONTAINER FINISHING
QUICK TURNAROUND TIMES

20 FOOT BIT CRIB

Our 20ft BIT CRIB containers are created with ease of transport in mind and we strive to meet the fastest turnaround times in the industry. Our containers come with an extensive list of standard features and can be customized specifically to our clients’ requirements. BIT-RAM has over 40 years of modular construction and HVAC experience  and our designed and fabricated Crypto Currency Mining Containers and Electrical Data Centres are completed with quality and flexibility for profitable and productive mining operations.

20 FOOT BIT CRIB Standard Specifications:
  • Full Electrical Service Fit Out (~500000 watts)
  • c/w twelve (12), 200 amp Power Distribution Units (PDUs)
  • Electrical Distribution – Raceway / Racking system with concealed wiring
  • Network Cabling and required switches
  • Interior of building c/w white finished cladding
  • Insulated walls and roof
  • Hot Deck Containment
  • Fully Balanced Exhaust Air System
  • Fully Balanced Recirculation Air System
  • Integrated Recirculation Bypass
  • Intake Filter Rack c/w 24”x24”x2” MERV 8 Filters
  • Air Flow, Temperature, and Humidity Sensors
  • Weather Hoods *SHIPPED LOOSE*
  • Checkerboard Flooring throughout
  • Required Lighting
  • Man Doors
  • Exterior of building c/w cladding and paint

KEY FEATURES

FULLY CUSTOMIZABLE – Flexible Design Options
FABRICATE TO ASIC AND GPU MINING APPLICATIONS
REMOTE ACCESS CAPABILITIES
ENGINEERED VENTILATION SYSTEM
NETWORK INFRASTRUCTURE – CAD 6 CABLE / NETWORK COMPONENTS
FULL CAD CAPABILITY
HIGH QUALITY CONTAINER FINISHING
QUICK TURNAROUND TIMES

REQUEST A QUOTE

REQUEST A QUOTE

QUESTIONS?

CALL NOW: 780.482.6838

QUESTIONS?

CALL NOW: 1.780.482.6838